Sorry about the delay guys. Handover went really well only a couple of minor things that I listed in the earlier post. The few items that will be done at the first service are
-Second picnic table to be installed in lieu of it being installed where I didnt want it.
-Replace rear bar with "Black" bar as stated on my sign off form (Plain Gal is on it now)
-Edge trim around Club Lounge table is overlapped on the join
-Dinette table is too tight as the bed converta (fits but its tight)
-Drifter panel and hot water switch to be moved next to the TV
-Gas bottle cover to be fitted to drawbar
Overall we are really happy with the finish, I couldn't really pick anything wrong with the finish. Thanks to
@burnsie's checklist we went over every cupboard, drawer, fitting and appliance and all was good.
All the cupboards have been fitted out with shelves and now saved me some money on not having to fit them out and we got a filtered fresh water tap that we never optioned or payed for.
So here are some pics
@Aussiejet