I have watched the youtube video of the Jayco factory tour, when asked how long it takes to build an Expanda, the chap said they build 90 a week so one every 20 odd minutes.... Could that be right...does not sound possible??
We went to the factory tour last week they have them lined up one after another at stations.
One guy just lays the floor over and over all day.
It is all split up like making a Lego
Not sure they get one done every 20 mins...
Spent a while watching the Swans and Silverlines not long at the Expanda area.
Length of time to build would vary a bit from design to design, depending on what's inside but;
Time to build = 20 mins per station x number of stations
An assembly line means continuous feed from one end down to the other.
90 per week doesn't really equate to mins worked in a week / 90
They may make it in a coulpe of hour but they spend a fair amount of work making each component.
That's why they do them in batches / runs so they can make 40 x walls, 40 x roofs etc of a particular model and then once that's done it gets run down the production line.
But its the month or so it takes to build all the components that gets missed in the equation....
I thought that too, its just that if they can make 90 a week then thats a Fair amount...maybe they are not all finished off in a week and still need wiring or something
As I said before, 90 coming off the line a week does not mean the van is made In a week, just that 90 come off in a week and 90 get started in a week, might take a week or more to make each one from start to finish. Why not someone ask when they go on a tour?
The guy giving our tour took us back to show use putting the walls on a Starcraft.. They do not skimp on what they put out of the tubes..
I bite my tongue when he went on about the QA check stations and how the quality is now great been on these forums now for a while........