I have a 2008 Jayco Sterling with solar power already fitted.
But the solar controller does not have any wiring to the LOAD terminals.
I presume that the battery input wires on the SETEC should be connected to this LOAD input on the controller, but what will happen when the 240v charger is in operation. Will it charge the battery through the LOAD connections.
But the solar controller does not have any wiring to the LOAD terminals.
I presume that the battery input wires on the SETEC should be connected to this LOAD input on the controller, but what will happen when the 240v charger is in operation. Will it charge the battery through the LOAD connections.